SFY

Adani Power Limited

BRSR Verified
Gujaratthermal-coal15,250 MWBSE:533096 | NSE:ADANIPOWER

86.43 Mt

Total Scope 1+2 (FY 2024-25)

76%

Scope 1

86.43 Mt

Direct emissions

Scope 2

1.4 kt

From purchased energy

Intensity

N/A

tCO2e/MWh

Renewable

N/A

Of energy consumed

Emissions Trend

Scope 1 Scope 2
025.0M50.0M75.0M100.0MFY '22-2349.0MFY '23-2472.9M 48.6%FY '24-2586.4M 18.5%

Year-by-Year Data

FYScope 1Scope 2IntensityAssuranceSource
2022-2349.00 Mt46.0 ktN/APDF
2023-2472.90 Mt5.3 kt0.840 tCO2e/MWhPDF
2024-2586.43 Mt1.4 ktN/AReasonablePDF p.328

Climate Commitments

Net Zero Target2050

Net zero by 2050 (Adani Group target). Adani Green targeting 50 GW renewable by 2030.

renewable energy expansioncoal-to-renewable transition
Source

Satellite Estimate

Climate TRACE

2023

74.25 Mt

6 facility matched (medium confidence)

Note: Climate TRACE tracks individual facilities via satellite, while BRSR covers company-wide operations. Differences are expected and don't indicate errors.

Company Details

Sector
power
State
Gujarat
Production Route
thermal-coal
Capacity
15,250 MW
BSE Code
533096
NSE Symbol
ADANIPOWER
Assurer
TUV India Pvt Limited
Boundary
standalone

Verified against filing

These numbers have been verified against the company's BRSR filing on BSE/NSE with source page references.

All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →

Report an error in this data

Supply to Adani Power Limited?

If you're in Adani Power Limited's value chain, you'll likely need to report your own emissions soon — for BRSR Core, CBAM declarations, or buyer questionnaires. We can help you calculate your Scope 1, 2, and 3 emissions.

Get Your Emissions Calculated