Adani Power Limited
BRSR Verified86.43 Mt
Total Scope 1+2 (FY 2024-25)
↑76%Scope 1
86.43 Mt
Direct emissions
Scope 2
1.4 kt
From purchased energy
Intensity
N/A
tCO2e/MWh
Renewable
N/A
Of energy consumed
Emissions Trend
Climate Commitments
Net zero by 2050 (Adani Group target). Adani Green targeting 50 GW renewable by 2030.
Satellite Estimate
Climate TRACE2023
74.25 Mt
6 facility matched (medium confidence)
Note: Climate TRACE tracks individual facilities via satellite, while BRSR covers company-wide operations. Differences are expected and don't indicate errors.
Company Details
- Sector
- power
- State
- Gujarat
- Production Route
- thermal-coal
- Capacity
- 15,250 MW
- BSE Code
- 533096
- NSE Symbol
- ADANIPOWER
- Assurer
- TUV India Pvt Limited
- Boundary
- standalone
Verified against filing
These numbers have been verified against the company's BRSR filing on BSE/NSE with source page references.
All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →
Report an error in this dataSupply to Adani Power Limited?
If you're in Adani Power Limited's value chain, you'll likely need to report your own emissions soon — for BRSR Core, CBAM declarations, or buyer questionnaires. We can help you calculate your Scope 1, 2, and 3 emissions.
Get Your Emissions Calculated